Further Floor Finishing Work

When it comes to further floor finishing work, the residual moisture content of the set concrete assumes elementary significance. As a rule, the residual moisture equilibrium of concrete of 3 to 5% relative humidity is obtained 6 to 8 weeks after pouring. If there are doubts about the moisture content, or if the time scale for the further floor finishing work needs to be shortened significantly, we recommend monitoring of the residual moisture content by means of measurements. We think that conventional CM measurements do not provide sufficient information  about the development of the moisture content. Therefore we have developed our own humidity measuring system "Elasco LiveCM". This allows us to monitor, record and analyse the residual moisture content quickly, easily, and economically. Link Elasco LiveCM.